First 98/2 gas will flow through S1-Vashishta Vol 20, PW 21 (13 Jul 17) Exploration & Production ONGC believes the fastest way to begin gas production from the Cluster 2 fields at... Buy this article forRs590 $9 For a 30-article or annual subscription rates click here RelatedGSPC ready for production at Cambay block (03 Dec 15) Gujarat Petronet hard sells gas in Madhya Pradesh (19 Jun 14) Gas strike for GSPC from Jurassic level at well KG#21 (09 Apr 09) Best ever KG flow rates brings smile back to GSPC (24 Jul 08) GSPC records up to 13m cf/d gas flow from KG#28 (20 Sep 07) Reliance signs pipeline deal with GSPL (07 Sep 06) Aiyar wants fast construction of southern gas grid (12 Jan 05) GAIL wants to commission Hazira to Trombay pipeline first (05 Nov 03) Reliance estimates 1.7 tcf in fifth KG well (12 Mar 03) ONGC Videsh books first gas from Vietnam block (04 Dec 02)